19:22 ✓ ← ASSIGNMENT #... CONSTRUCTION SURVEYING BSC212 AY2021-2022; SEM III ASSIGNMENT #2: DUE DATE: 07/06/22 For the l
Posted: Wed Jun 08, 2022 7:32 am
19:22 ✓ ← ASSIGNMENT #... CONSTRUCTION SURVEYING BSC212 AY2021-2022; SEM III ASSIGNMENT #2: DUE DATE: 07/06/22 For the levelling shown below, calculate adjusted reduced levels for all points in the level table using a) Rise and Fall method; b) Height of Collimation method. IS FS Remarks BS 1.832 TBM 62.117 m 2.150 2.379 Change point 1.912 A 1.949 B 2.630 C 1.165 1.539 D 2.381 2.212 Change point 2.070 E 2.930 F 0.954 G 2.425 H 0.879 TBM 62.629 m ||| o { | <