A vertical curve, where a downgrade of 7.93% meets another downgrade of 2.78%, has to be realigned such that it passes t
Posted: Wed Jun 08, 2022 7:22 am
A vertical curve, where a downgrade of 7.93% meets another downgrade of 2.78%, has to be realigned such that it passes through a point which has a reduced level of 72,216m MSL which is 195m from the BVC. The BVC level is 82,37m. What is the length of vertical curve will meet these requirements? (3)