Assume the clear span is your last four digits of university number, for the given beam find the following: 1. Volume of
Posted: Wed Jun 08, 2022 6:33 am
plz help me bro 
this past paper exam
Assume the clear span is your last four digits of university number, for the given beam find the following: 1. Volume of the concrete 2. Cutting length of straight bars. 3. Cutting length of Bent-up bar. 4. Cutting length & Number of stirrups required. 5. Total weight of steel required in beam. 40 mm clear cover 108 @ 180 c/c stirrups 1012 Bentup bar I 300 Section A-A 230 2012 Anchor bar 2016 Main bar 570 Clear span X, (X) Clear span = 3501 mm A
Q2. (5 Points) an excavation is to be made for a reservoir 400m long and the width at the bottom is he last two digits of your university number. The side slope of the excavation has to e 2:1. Calculate the volume of earth work using prismoidal method if the depth of cavation is 5m. Assume level ground at the site.
this past paper exam
Assume the clear span is your last four digits of university number, for the given beam find the following: 1. Volume of the concrete 2. Cutting length of straight bars. 3. Cutting length of Bent-up bar. 4. Cutting length & Number of stirrups required. 5. Total weight of steel required in beam. 40 mm clear cover 108 @ 180 c/c stirrups 1012 Bentup bar I 300 Section A-A 230 2012 Anchor bar 2016 Main bar 570 Clear span X, (X) Clear span = 3501 mm A
Q2. (5 Points) an excavation is to be made for a reservoir 400m long and the width at the bottom is he last two digits of your university number. The side slope of the excavation has to e 2:1. Calculate the volume of earth work using prismoidal method if the depth of cavation is 5m. Assume level ground at the site.