A topographic profile along the route was taken by a surveyor leveling from point I to point 5. The 5 data are tabulated
Posted: Wed Jun 08, 2022 6:20 am
Topographic , SURVEYING LAP
A topographic profile along the route was taken by a surveyor leveling from point I to point 5. The 5 data are tabulated below. betrum Foresight Peadings Sys 51 3.93 119.65 BM 52 2.66 $3 4.28 54 421 53 vation at 55 equa 118.37 120.92 123.58 126.60 0
A topographic profile along the route was taken by a surveyor leveling from paint I to point 5. The 5 data are tabulated below, hutes assign Peading 51 3.93 119.65 BM 52 GAP $3 2.66 428 421\ ation at 55 118 37 120.92 123.58 126.60 1TP
A topographic profile along the route was taken by a surveyor leveling from point I to point 5. The 5 data are tabulated below. betrum Foresight Peadings Sys 51 3.93 119.65 BM 52 2.66 $3 4.28 54 421 53 vation at 55 equa 118.37 120.92 123.58 126.60 0
A topographic profile along the route was taken by a surveyor leveling from paint I to point 5. The 5 data are tabulated below, hutes assign Peading 51 3.93 119.65 BM 52 GAP $3 2.66 428 421\ ation at 55 118 37 120.92 123.58 126.60 1TP