2. A steel product is manufactured by starting with raw material (carbon steel wire) and then processing it sequentially
Posted: Mon Jun 06, 2022 7:37 am
questions. (1 point each) a) What is the maximum output per hour of the steel product? b) By how much would the output be improved if the output of B was increased to 90 per hour? c) By how much would the output be improved if the output for C was increased to 50 per hour? d) By how much would the output be improved if the output for C was increased to 70 per hour? e) What is the effect on the system if machine A can only manage an output of 90 in one hour? f) What is the effect on the system if machine C can only manage an output of 30 in one hour? g) What is the effect on the system if machine B is allowed to drop to an output of 30 in one hour?
2. A steel product is manufactured by starting with raw material (carbon steel wire) and then processing it sequentially through five operations using machines A to E, respectively (see following table). This is the only use that the five machines are put to. The hourly rates for each machine are given in the table. Operation: 1 2 3 4 5 Machine: A B с D E Hourly unit 100 80 40 60 90 output rate: Answer the following