Compute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manuf

Posted: Sun Jun 05, 2022 6:35 pm
by answerhappygod
Compute Lead Time Jackson Fabricators Inc Machines Metal Parts For The Automotive Industry Under The Traditional Manuf 1
Compute Lead Time Jackson Fabricators Inc Machines Metal Parts For The Automotive Industry Under The Traditional Manuf 1 (29.62 KiB) Viewed 33 times
Compute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 50 parts. A part requires 5 minutes in milling and 10 minutes in finishing. The move time between the two operations for a complete batch is 11 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 3 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Traditional Philosophy Lean Manufacturing Philosophy Value-added time min min Non-value-added time min min Total lead time min min Value-added ratio (as a percent) % %