- 3 A The Cost Of Manufacturing Motor Cycles Per Day Is Related To Number To Number Of Motor Cycles Produced Per Day 1 (299.12 KiB) Viewed 63 times
3(a) The cost of manufacturing motor cycles (per day) is related to number to number of motor cycles produced, per day.
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
3(a) The cost of manufacturing motor cycles (per day) is related to number to number of motor cycles produced, per day.
3(a) The cost of manufacturing motor cycles (per day) is related to number to number of motor cycles produced, per day. If the cost function (C) is related to the following equation as given, determine the optimum number of motor cycles that need to be produced, daily, corresponding to minimum cost. Note that X denotes total number of motor cycles manufactured per day. Total Cost (C) in SAR = (1/3)* X³- 200*X² -50000*X. let'say, If (5 POINTS) number of produced C =X²2 - 200x²50000 X is 500/day and one 3 motor cycle cost 10000Rs the total cost 500×10000 5000000 200x² -50000X 4 500 0000 RS x= motor cycle / day Il x= 5000000