Page 1 of 1

3(a) The cost of manufacturing motor cycles (per day) is related to number to number of motor cycles produced, per day.

Posted: Sun Jun 05, 2022 11:59 am
by answerhappygod
3 A The Cost Of Manufacturing Motor Cycles Per Day Is Related To Number To Number Of Motor Cycles Produced Per Day 1
3 A The Cost Of Manufacturing Motor Cycles Per Day Is Related To Number To Number Of Motor Cycles Produced Per Day 1 (160.25 KiB) Viewed 54 times
you can solve it if you have knowledge about economics
3(a) The cost of manufacturing motor cycles (per day) is related to number to number of motor cycles produced, per day. If the cost function (C) is related to the following equation as given, determine the optimum number of motor cycles that need to be produced, daily, corresponding to minimum cost. Note that X denotes total number of motor cycles manufactured per day. Total Cost (C) in SAR = (1/3)* X³- 200*X² -50000*X. (5 POINTS) (b) A land property is providing services in uniform manner. On basis of DECLINING BALANCE DEPRECIATION, fill the table below. Assume the Initial value of the land is 10000 Riyals. Determine the Salvage value by completing the table. The depreciation rate is 200% and Life of the project is 5 years. N (years) BN-1 DN (5 POINTS) BN (Book Value) (Book Value) (Depreciation Value) 1 2 3 4 5 4 сл