Page 1 of 1

1. The following crew is normally capable of completing 360 S.F. per day of two sides of a 2-coat vermiculite plaster on

Posted: Mon May 30, 2022 4:19 pm
by answerhappygod
1 The Following Crew Is Normally Capable Of Completing 360 S F Per Day Of Two Sides Of A 2 Coat Vermiculite Plaster On 1
1 The Following Crew Is Normally Capable Of Completing 360 S F Per Day Of Two Sides Of A 2 Coat Vermiculite Plaster On 1 (53.24 KiB) Viewed 17 times
1. The following crew is normally capable of completing 360 S.F. per day of two sides of a 2-coat vermiculite plaster on gypsum lath for a partition wall with metal studs spaced every 16". This crew is hired to plaster 200 L.F. of 8'- high interior partitions in an office building. The crew productivity should be adjusted due to better weather conditions (factor of 1.05) and project complexity (factor of 1.06). Estimate: 1. the adjusted crew productivity, 2. job duration (in full days), 3. MH., M.D., C.H., and C.D. labor wage rates for this crew, and 4. total labor cost of the job. Hourly Crew Wage and Member Burden $47.75 3 Plasterers + $15.80 $41.15 Plasterer Helpers $14.80 $50.25 + $15.90 2 1 Lather