Page 1 of 1

A private developer has appointed your Consulting Firm to assist in designing civil infrastructure for the proposed Ware

Posted: Thu May 26, 2022 11:45 am
by answerhappygod
A Private Developer Has Appointed Your Consulting Firm To Assist In Designing Civil Infrastructure For The Proposed Ware 1
A Private Developer Has Appointed Your Consulting Firm To Assist In Designing Civil Infrastructure For The Proposed Ware 1 (223.01 KiB) Viewed 11 times
A private developer has appointed your Consulting Firm to assist in designing civil infrastructure for the proposed Warehouse for cement storage. The scope of the work consists of two separate work packages: Work Package 1: Traffic Impact Assessment (TIA) study required to support the application for the land- use change and rezoning certification approval of the proposed development of the Warehouse. Traffic Impact Assessment (TIA) study is required to support the application for the land use change and rezoning certification approval of the proposed development of a cement Warehouse. The study area is located in Vanderbijlpark at the intersection of R28 Road and Frikkie Meyer Blvd (See Figure 1). The size of the proposed warehouse is 3 020 m2. The construction of the proposed warehouse is expected to be completed and start operation during the current year (2022). It is anticipated that all the development traffic will make use of the intersection of R28 Road and Frikkie Meyer Blvd. Base year (2022) traffic count was recently undertaken at the intersection. The traffic volumes obtained during the site survey are summarized in Appendix A. Use resources in the guidelines such as TMH 16, TRH 4, THR 14, TRH 16, TRH 17 and TRH 26, as well as your engineering judgment in making these decisions and/or assumptions and explain why you chose the values you did. Provide references (e.g. Table number, Figure number, etc). Show all steps. 7 Appendix A: Base-year peak hour traffic volumes DIRECTIONS NORTH EAST WEST SOUTH Straight Turning Left Straight Turning Right Turning Left Straight Turning Right Turning Left Straight Turning Right Turning Right (M9) (M2) (M1) (M3) (MI) (M4) (M5) (M6) (MB) (M10) (M12) 26 69 47 70 222 2 234 125 191 332 161 178 7 103 32 113 74 11 116 68 347 92 149 20 Movements for the 4-legs Intersection R28 Frikkie Meyer Blvd PERIOD AM PM N Moshoeshoe Street Turning Left (M7)