40. The theoretical output that could be attained if a process were operating at a full speed without interruption is ca
Posted: Thu May 26, 2022 8:41 am
40. The theoretical output that could be attained if a process
were operating at a full speed without interruption is called A.
Maximum capacity B. Effective capacity C. Capability D. Efficiency
E. Design capacity
A. Service-oriented
B. Variable
C. Attribute
D. Reliability
E. Competence
were operating at a full speed without interruption is called A.
Maximum capacity B. Effective capacity C. Capability D. Efficiency
E. Design capacity
A. Service-oriented
B. Variable
C. Attribute
D. Reliability
E. Competence