Situation 1. The concrete pipes are connected in series. The rate of flow in the pipe is 0.10 m³/s. 1. Determine the tot
Posted: Tue May 24, 2022 10:51 am
Situation 1. The concrete pipes are connected in series. The
rate of flow in the pipe is 0.10 m³/s.
1. Determine the total head loss in meters.
L₁ = 350m D₁ = 250mm f₁ = 0.02 : L₂ = 300m D₂ = 150mm D2 f₂ = 0.025 L3 = 500m D3 = 210mm f3 = 0.03
rate of flow in the pipe is 0.10 m³/s.
1. Determine the total head loss in meters.
L₁ = 350m D₁ = 250mm f₁ = 0.02 : L₂ = 300m D₂ = 150mm D2 f₂ = 0.025 L3 = 500m D3 = 210mm f3 = 0.03