(c) A dam project will be constructed in the Kenyir area. The laboratory test results on a saturated soil test being use
Posted: Sat May 21, 2022 2:53 pm
(c) A dam project will be constructed in the Kenyir area. The laboratory test results on a saturated soil test being used indicated that it has the initial and final volume is 24.6 cm and 15.9 cm”, mass of wet soil (mı) is 44 gm and mass of dry soil (m2) is 30.1 gm. Based on the data given, determine the shrinkage limit of the soil.