[phpBB Debug] PHP Warning: in file [ROOT]/ext/lmdi/autolinks/event/listener.php on line 237: Undefined array key 9
[phpBB Debug] PHP Warning: in file [ROOT]/ext/lmdi/autolinks/event/listener.php on line 237: Trying to access array offset on value of type null
Answer Happy • Question 3. [20 points) The project of paving a road with a length of 3000 and it consists of the following activities,
Page 1 of 1

Question 3. [20 points) The project of paving a road with a length of 3000 and it consists of the following activities,

Posted: Sat May 21, 2022 1:28 pm
by answerhappygod
Question 3 20 Points The Project Of Paving A Road With A Length Of 3000 And It Consists Of The Following Activities 1
Question 3 20 Points The Project Of Paving A Road With A Length Of 3000 And It Consists Of The Following Activities 1 (43.81 KiB) Viewed 14 times
Question 3. [20 points) The project of paving a road with a length of 3000 and it consists of the following activities, in order Notes Activity name Activity speed m 30 per day m 25 per day 20m per day 40m per day 35m per day m 50 per day WN A 1 B 2 c 3 4 E 5 F 6 D Noties < A w you work, the word hy en coording to the arrest and soccording and the working days have passed, work is stopped by order of the mostponsible authorities for a period of working days, then they are allowed to work, but at a faster peron only the following table Activity speed Activity name m 40 per day 1 30m per day B 2 30m per day с 3 m 45 per day 4 40m per day E 5 m 55 per day F 6 D Required Calculate the total project time, illustrated by graphs, using the cyclogram method Same page for the entire project, ingortant notos: The contract has been concluded as follows: Use the relationships SS=3days or FF=3days Checks: The third activity) requires a five-day examination and is conducted twice (each half of the road alone.