Architecture project All I need is the concrete project done For the Projects Complete environmental analysis (recall th
Posted: Sat May 21, 2022 1:06 pm
Architecture project All I need is the concrete project
done
For the Projects
Complete environmental analysis (recall the assignment) – solar,
wind, rainfall, etc… Provide charts from Climate Consultant. Add
your plan outline into to the diagrams. Describe in section the
solar shading, wind direction and flows, and other environmental
considerations.
Provide a short narrative of your decisions.
Illustrate precedent analysis and construction details. Recall
the projects we looked at in the lectures and those you looked at
independently.
Illustrate material choices and details.
For both the Concrete Project and the Steel Project
Complete the Plans and Sections. 2 floor plans, 2 sections
1/8”=1’-0”, site/roof plan 1” = 40’
Complete the column grid. Indicate structural bays with dashed
lines in all drawings.
Provide detail of the envelope with materials (solid and
glazing), proper insulation (wall and roof), and appropriate sun
shading systems. PROGRAM REQUIREMENTS - REMINDERS
RESEARCH AREA 50’X125’X25’ high, space cannot
be interrupted
OFFICE SPACE 3000 sq.ft.,
9’ HIGH, Dimensions are variable.
ENTRY
MINIMUM 300 sq.ft, must connect to core. Dimensions are
variable.
2 CORES EACH 18X18 see
below. A 1 story building still needs a stair to get to the
roof.
PARKING LOT
10 CARS, SHADED. Dimensions are variable. NOT A GARAGE..
done
For the Projects
Complete environmental analysis (recall the assignment) – solar,
wind, rainfall, etc… Provide charts from Climate Consultant. Add
your plan outline into to the diagrams. Describe in section the
solar shading, wind direction and flows, and other environmental
considerations.
Provide a short narrative of your decisions.
Illustrate precedent analysis and construction details. Recall
the projects we looked at in the lectures and those you looked at
independently.
Illustrate material choices and details.
For both the Concrete Project and the Steel Project
Complete the Plans and Sections. 2 floor plans, 2 sections
1/8”=1’-0”, site/roof plan 1” = 40’
Complete the column grid. Indicate structural bays with dashed
lines in all drawings.
Provide detail of the envelope with materials (solid and
glazing), proper insulation (wall and roof), and appropriate sun
shading systems. PROGRAM REQUIREMENTS - REMINDERS
RESEARCH AREA 50’X125’X25’ high, space cannot
be interrupted
OFFICE SPACE 3000 sq.ft.,
9’ HIGH, Dimensions are variable.
ENTRY
MINIMUM 300 sq.ft, must connect to core. Dimensions are
variable.
2 CORES EACH 18X18 see
below. A 1 story building still needs a stair to get to the
roof.
PARKING LOT
10 CARS, SHADED. Dimensions are variable. NOT A GARAGE..