4 Number of cut bars in 6 meter * (5 Points) 28 O 14 O 420 4 5 Total number of 16mm bar needed for 15 footings * (5 Poin
Posted: Sat May 21, 2022 12:20 pm
questions on the picture:
There are 15 units of footings and columns
Height of the top of column footing to the natural ground line = 1.5m
From natural ground line to the bottom of the beam = 3.0m
Depth of the beam = 0,30m
Slab thickness = 0.10m
Bend at the footing = 0.50m
Provide dowel for second floor provision = 0.50m
protective side covering for footing foundation = 0.075 m
Protective covering of column = 0.05 m
Consider length of hook and bending = 240mm
use 40cm for tie wire
Please Answer the following questions on the picture, choices are given. Thanks
4 Number of cut bars in 6 meter * (5 Points) 28 O 14 O 420 4 5 Total number of 16mm bar needed for 15 footings * (5 Points) 100 O 420 105 28
Using the following figures and data, answer the There are 15 units of footings and columns
Height of the top of column footing to the natural ground line = 1.5m
From natural ground line to the bottom of the beam = 3.0m
Depth of the beam = 0,30m
Slab thickness = 0.10m
Bend at the footing = 0.50m
Provide dowel for second floor provision = 0.50m
protective side covering for footing foundation = 0.075 m
Protective covering of column = 0.05 m
Consider length of hook and bending = 240mm
use 40cm for tie wire
Please Answer the following questions on the picture, choices are given. Thanks
4 Number of cut bars in 6 meter * (5 Points) 28 O 14 O 420 4 5 Total number of 16mm bar needed for 15 footings * (5 Points) 100 O 420 105 28