3 (it) What is the difference between abso b) A numerical control drill press drills four 10.0 mm diameter holes at four
Posted: Sat May 21, 2022 8:50 am
3 (it) What is the difference between abso b) A numerical control drill press drills four 10.0 mm diameter holes at four locations on a Flat aluminum plate in a production work cycle. Although the plate is only 12 mm thick, the drill must travel a full 20 mm vertically at each hole location to allow for clearance above the plate and breakthrough of the drill on the underside of the plate. Cutting conditions: speed=0.4 m/s and feed - 0,10 mm/rev. Hole locations are indicated in the following table: Hole number x-coordinate (mm) y-coordinate (mm) 1 25.0 25.0 2 25.0 100.0 3 100.0 100.0 4. 100.0 25.0 The drill starts out at point (0,0) and returns to the same position after the work cycle is completed. Travel rate of the table in moving from one coordinate position to another is 500 mm/min. Owing to effects of acceleration and deceleration, and time required for the control system to achieve final positioning, a time loss of 3 s is experienced at each stopping position of the table. Assume that all moves are made so as to minimize the total cycle time. If loading and unloading the plate take 20 s (total handling time), determine the time required for the work cycle. 78 marks/