For a dynamic branch predictor, what is the likelihood (probability) that the processor will not have to flush the pipel
Posted: Fri May 20, 2022 5:22 pm
For a dynamic branch predictor, what is the likelihood (probability) that the processor will not have to flush the pipeline and start over after it has predicted four branches with a prediction accuracy of 95% correct? Give the answer as a decimal value between 0 and 1 or a percentage (%) accurate to a minimum of 2 digits. If you give a %, do not include the % sign in your answer, only the number. 0.57