65. The minimum length of MPS time horizon is: at least equal to the cumulative lead time 12 months a management policy
Posted: Fri May 20, 2022 9:27 am
65. The minimum length of MPS time horizon is: at least equal to the cumulative lead time 12 months a management policy decision not an issue, and can be any length management wants it to be