At the Han Solo production plant the production planner has just generated the following production plans (these have no

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

At the Han Solo production plant the production planner has just generated the following production plans (these have no

Post by answerhappygod »

At the Han Solo production plant the production planner has just
generated the following production plans (these have not been
validated with production if they are feasible to produce):
MPS 1
-2
-1
0
1
2
UN
100
200
750
550
150
B
50
75
300
225
50
C
50
75
300
225
50
D
100
0
150
100
50
Below is the BOM and relevant information for each of the above
products:
Product
X
w
y
z
a
1
0
1
1
B
1
0
2
2
C
0
1
2
1
D
0
1
1
2
Initial Inv
0
0
0
0
Inv Security
10%
20%
15%
10%
AQL
95%
98%
99%
95%
The lead time of X and Y is 1 period and that of W and Z is 2
periods. You have a net available time per period of 10
hours. On the other hand, it is established that the
efficiency with respect to time is always 95% and the utilization
of 97%. Times are given by complete unity.
The production process is shown below:
At The Han Solo Production Plant The Production Planner Has Just Generated The Following Production Plans These Have No 1
At The Han Solo Production Plant The Production Planner Has Just Generated The Following Production Plans These Have No 1 (44.11 KiB) Viewed 28 times
Note: M1 has a production capacity of 400 und/h, M2 of 800
unds/h and so on with all machines.
Consider that in the assembly both X and W are wasted.
Considering the above, how much is the maximum capacity
that can be made of each product? (45 points)
If Han Solo just approved a 0 overtime policy. What
should be the production plan for the established periods? (10
points)
*Note: everything A is produced, if there is too much time
all B is produced, if there is too much time all C is produced and
finally D is made.
Based on that production plan:
Calculate the MRP tracker of the different raw
materials. (45 points)
896 10% X M1 400 M2 800 Ensamble M3 200 M4 200 Ensamble Final A,B,C,D 10% w M6 800 M7 1000 Z M9 400 M10 200 15% M11 100 8 896 10%