The following company produces laptops. The laptops are assembled in 3 different plants. There are 3 models of laptops:

Posted: Fri May 20, 2022 7:52 am
by answerhappygod
The Following Company Produces Laptops The Laptops Are Assembled In 3 Different Plants There Are 3 Models Of Laptops 1
The Following Company Produces Laptops The Laptops Are Assembled In 3 Different Plants There Are 3 Models Of Laptops 1 (60.56 KiB) Viewed 41 times
The following company produces laptops. The laptops are assembled in 3 different plants. There are 3 models of laptops: single speed, medium speed and large speed. As part of the assembly process, the laptop requires a specific quantity of microprocessor installed based on laptop model. The unit net profits, maximum daily demand, and microprocessor requirements for these laptops are in the table below. The maximum daily assembly capacity for any mix of laptops is given below. The maximum microprocessor production per day, in units, is below too. Product Model Sales price ($ / laptop) $500 $1000 $2000 Maximum demand (laptops / day) 900 600 Microprocessors requirements (units / laptop) 2 Single speed Medium speed Large speed 4 6 250 Plant Assembly Maximum capacity microprocessors (laptops/day) production (units/day) 450 750 750 600 425 500 1 2 3 a. Formulate a Linear Programming that allocates the production of the three model of laptops in the three plants in a manner that maximizes profit. (Do not resolve, only formulate the linear programming with its components).