THE CASE STUDY ON HYDRO ONE, CANADA 1. Explain how Hydro One implemented its Enterprise Risk Management (ERM) program 2.
Posted: Fri May 20, 2022 7:01 am
THE CASE STUDY ON HYDRO ONE, CANADA
1. Explain how Hydro One implemented its Enterprise Risk
Management (ERM) program
2. Identify SIX KRIs Hydro One faced. Three of the KRIs should
be systematic and the other Three should be unsystematic risks.
3. Analyze the method Hydro One used in identifying the Key Risk
Indicators (KRI)
4. Explain how Hydro One setup its risk controls to mitigate the
KRIs
5. Identify any risk that Hydro One failed to identify and what
problems did the company face as a result.
1. Explain how Hydro One implemented its Enterprise Risk
Management (ERM) program
2. Identify SIX KRIs Hydro One faced. Three of the KRIs should
be systematic and the other Three should be unsystematic risks.
3. Analyze the method Hydro One used in identifying the Key Risk
Indicators (KRI)
4. Explain how Hydro One setup its risk controls to mitigate the
KRIs
5. Identify any risk that Hydro One failed to identify and what
problems did the company face as a result.