The answer should be in CPM method
Posted: Fri May 20, 2022 7:00 am
The answer should be in CPM method
A company have to develop a product has following times schedule Activity Times in weeks Activity Times in weeks 4 8 1 1 1 (1 – 2) (1 - 3) (2-4) (3 – 4) (3-5) (4-9) (5-6) (5 – 7) (6-8) (7-8) (8-9) 2. 1 1 6 8 5 (8 – 10) (9 – 10) 7 4 Construct the network and compute 1. TE and TL for each event 2. Float for each activity 3. Critical path and its duration
A company have to develop a product has following times schedule Activity Times in weeks Activity Times in weeks 4 8 1 1 1 (1 – 2) (1 - 3) (2-4) (3 – 4) (3-5) (4-9) (5-6) (5 – 7) (6-8) (7-8) (8-9) 2. 1 1 6 8 5 (8 – 10) (9 – 10) 7 4 Construct the network and compute 1. TE and TL for each event 2. Float for each activity 3. Critical path and its duration