Page 1 of 1

Exhibit 1 presents a partial MRP transaction report for the parts necessary to manufacture the lamp shown in the product

Posted: Fri May 20, 2022 6:37 am
by answerhappygod
Exhibit 1 Presents A Partial Mrp Transaction Report For The Parts Necessary To Manufacture The Lamp Shown In The Product 1
Exhibit 1 Presents A Partial Mrp Transaction Report For The Parts Necessary To Manufacture The Lamp Shown In The Product 1 (46.15 KiB) Viewed 48 times
Exhibit 1 Presents A Partial Mrp Transaction Report For The Parts Necessary To Manufacture The Lamp Shown In The Product 2
Exhibit 1 Presents A Partial Mrp Transaction Report For The Parts Necessary To Manufacture The Lamp Shown In The Product 2 (70.62 KiB) Viewed 48 times
Exhibit 1 presents a partial MRP transaction report for the parts necessary to manufacture the lamp shown in the product structure to the right Lamp Base Assembly Shan Tubing (2 foed) Plate Hub Screws (6) Shade Socket Assembly Holder Socket Wiring Assembly Wire (8 feet) Plug Compete the MRP transaction report in the exhibit for the parts and then answer the following questions: A. Where do the gross requirements for 55 wire assemblies in period 8 come from? What feature of an MRP system allows you to identify the origin of these requirements? B. What actions, if any should be taken in period 1? c. If the gross requirements in period 9 for the lamp were increased by 10 units, what new actions, if any should be taken in period 1?
Lamp Laddy Lot for Lot Safety Stock 5 6 7 8 3 9 65 30 40 20 Gross Requirements Scheduled Receipts On Hand 28 Planned Order Release Safety Stock- 6 7 8 9 Socket Assembly Leadtime day FOOL.230 1 2 3 4 5 Gross Requirements Scheduled Receipts On Hand 8 Planned Order Release Wiring Assembly Lendtime Day 1 Lot for Lot Safety Stock- 5 6 7 8 2 3 9 55 Gross Requirements Scheduled Receipts On Hand 5 Planned Order Release Wire Leadtime... Days FQ.50 Foot Speels Safety Stock - 100 feet 1 2 5 6 7 8 3 4 Gross Requirements Scheduled Receipts On Hand 800 ft. Planned Order Release