16 20 3 h 56 60 86 90 100 116 120 13 Duration(Days) Description Task (FAST phases A B С D E 15 25 35 25 40 Scope Definit
Posted: Fri May 20, 2022 5:55 am
16 20 3 h 56 60 86 90 100 116 120 13 Duration(Days) Description Task (FAST phases A B С D E 15 25 35 25 40 Scope Definition Problem Analysis Requirement Analysis Logical Design Decision analysis Physical design and integration Construction and testing Installation and delivery F 20 G 20 H 15 Given the table above, construct a PERT chart using the backward and revers