If the IRR for a project is greater than the MARR, then the project is _____________ A.) Acceptable B.) Unacceptable

Posted: Thu May 19, 2022 9:20 am
by answerhappygod
If the IRR for a project is greater than the MARR, then the
project is _____________
A.) Acceptable
B.) Unacceptable