Page 1 of 1

Kelson Sporting Equipment, Inc., makes two different types of baseball gloves: a regular model and a catcher's model. Th

Posted: Tue Nov 16, 2021 8:33 am
by answerhappygod
Kelson Sporting Equipment Inc Makes Two Different Types Of Baseball Gloves A Regular Model And A Catcher S Model Th 1
Kelson Sporting Equipment Inc Makes Two Different Types Of Baseball Gloves A Regular Model And A Catcher S Model Th 1 (77.95 KiB) Viewed 179 times
Kelson Sporting Equipment, Inc., makes two different types of baseball gloves: a regular model and a catcher's model. The firm has 800 hours of production time available in its cutting and sewing department, 150 hours available in its finishing department, and 400 hours available in its packaging and shipping department. The production time requirements and the profit contribution per glove are given in the following table: Production Time (Hours) Cutting and Packaging and Shipping Model Sewing Finishing Profit/Glove Regular model 1 1 1/4 1/6 $5 5 Catcher's model 1/2 1/2 1/4 $7 7 Assuming that the company is interested in maximizing the total profit contribution, answer the following: (a) What is the linear programming model for this problem? If required, round your answers to 3 decimal places or enter your answers as a fraction. If the constant is "1" it must be entered in the box. Do not round intermediate calculation. If an amount is zero, enter "0" Let R = number of units of regular model. C = number of units of catcher's model. C = Max 5 OR + 7 с s.t. 0 + XR 0.500 с s 800 Cutting and Sewing + 0.500 R 0.250 cs 150 Finishing + OR + 0.167 0.250 cs 400 Packing and Shipping RC 2 2 0
(b) Develop a spreadsheet model and find the optimal solution using Solver. How many gloves of each model should Kelson manufacture? If your answer is zero enter "O". Regular Model = o units Catcher's Model = 600 units (c) What is the total profit contribution Kelson can earn with the given production quantities? 4200 X (d) How many hours of production time will be scheduled in each department? Department Time Used (Hours) Cutting and Sewing 3 Finishing X Packing and Shipping (e) What is the slack time in each department? If your answer is zero, enter "0". Department Slack Time (Hours) Cutting and Sewing Finishing Packing and Shipping