Page 1 of 1

Unit 6 mm/day 1.1 Silty Clay 20 % Given the following information/Data: 1 Reference Eva potranspiration 2 Crop Coefficie

Posted: Tue May 17, 2022 7:07 pm
by answerhappygod
Unit 6 Mm Day 1 1 Silty Clay 20 Given The Following Information Data 1 Reference Eva Potranspiration 2 Crop Coefficie 1
Unit 6 Mm Day 1 1 Silty Clay 20 Given The Following Information Data 1 Reference Eva Potranspiration 2 Crop Coefficie 1 (94.92 KiB) Viewed 110 times
Unit 6 mm/day 1.1 Silty Clay 20 % Given the following information/Data: 1 Reference Eva potranspiration 2 Crop Coefficient 3 Soil texture 7 Residual Moisture Content 8 Crop Root Zone Depth 9 Standing water 10 Effective rainfall 11 Application Efficiency 12 Conveyance Efficiency 15 cm 5 mm 4 mm 60 % 65 % Compute the following: 1 Crop water requirement (CWR) in mm 2 Land soaking water requirement (LSR) in mm 3 Land preparation water requirement (LPWR) in mm 4 Farm water requirement (FWR) in mm 5 Diversion water requirement (DWR) in mm 6 If the discharge of the main canal is 200 liters per second, how many hours will it take to irrigate if the estimated farm size to be served by main canal is 3.0 hectares ? Show your complete, and detailed solution.