Civil Engineering - Water Resources Q1-b (b) For the catchment, with highly uneven topography, shown in Worksheet Q1, es
Posted: Mon May 16, 2022 12:50 pm
Civil Engineering - Water Resources Q1-b (b) For the catchment, with highly uneven topography, shown in Worksheet Q1, estimate the areal (average) rainfall due to a storm event occurred over that catchment. The rainfall measurements at gauges A, B, C, D and E are 15 mm, 50 mm, 70 mm, 80 mm and 25 mm, respectively. (i) Use Thiessen Polygon method (ii) Use Arithmetic average method (iii) Comment on the suitability of the above two methods to the given catchment.
ID No.: WORKSHEET Q1 Ο Ε > 00 B D ос Scale: 1 100000
ID No.: WORKSHEET Q1 Ο Ε > 00 B D ос Scale: 1 100000