Lag is time associated with a link line Activity 3 Link line with positive link lag value, e.g., 3 ES Duration LS Link l
Posted: Mon May 16, 2022 9:14 am
Lag is time associated with a link line Activity 3 Link line with positive link lag value, e.g., 3 ES Duration LS Link line with zero link lag value Link line that is *critical" (also with zero link lag value) EF FF TF LF It indicates the difference between the early finish of the activity preceding the link and the early start of the activity following the link Lag is not the same as lead time or delay assigned to a link TAIN Fon D 2012, 2003, 2004, 1993 Pearson Higher Education, Inc
Notice to Proceed 0 Order Deliver Materials 10 Remove Existing Finishes 2 Paint Walls 1 Set up Nerative Air Machines Replace Existing light Fixtures Verify Electrical Services Set-up Hand Wash Station det ing
Install Nurse Station Final Touch-up Paint Install Ceiling Tile Demobilize/Complete Install Sink 2 Final Cleaning
Notice to Proceed 0 Order Deliver Materials 10 Remove Existing Finishes 2 Paint Walls 1 Set up Nerative Air Machines Replace Existing light Fixtures Verify Electrical Services Set-up Hand Wash Station det ing
Install Nurse Station Final Touch-up Paint Install Ceiling Tile Demobilize/Complete Install Sink 2 Final Cleaning