During the asphalt mixing lab last week, a group weighed the dry aggregates as 6286.4 g. If the group was assigned to ha
Posted: Mon May 16, 2022 8:02 am
During the asphalt mixing lab last week, a group weighed the dry aggregates as 6286.4 g. If the group was assigned to have binder content Pb=4.5%, estimate the quantity of asphalt needed to pour into the aggregates? If the group actually poured 315.8 g asphalt into the aggregates, what was the actual binder content of the asphalt mixture?