How many turns are required to move the X-axis 1.500" on a knee mill using the dial shown? 10 0 20 190 O 2.5 5.5 7.5 0 3
Posted: Mon May 16, 2022 5:52 am
How many turns are required to move the X-axis 1.500" on a knee mill using the dial shown? 10 0 20 190 O 2.5 5.5 7.5 0 3.5 If fixed costs are $400 and variable costs per part are $6.85, what is the total cost for 1000 parts? O 400 6850 O 1085 7250