The cut speed for a milling operation calls for 200 sfpm with a 4 flute, .375" diameter HSS end mill. Approximately wha
Posted: Mon May 16, 2022 12:13 am
The cut speed for a milling operation calls for 200 sfpm with a
4 flute, .375" diameter HSS end mill. Approximately what RPM
should be used?
533
6110
2037
3820
A milling operation calls for a 4 flute, .750" dia., carbide
insert flat end mill at .004ipt, 750RPM. How long in minutes
will it take to make a 24" cut?
8.0
6.0
2.0
1.5
If fixed costs are $400 and variable costs per part are $6.85,
what is the total cost for 1000 parts?
1085
7250
400
6850
4 flute, .375" diameter HSS end mill. Approximately what RPM
should be used?
533
6110
2037
3820
A milling operation calls for a 4 flute, .750" dia., carbide
insert flat end mill at .004ipt, 750RPM. How long in minutes
will it take to make a 24" cut?
8.0
6.0
2.0
1.5
If fixed costs are $400 and variable costs per part are $6.85,
what is the total cost for 1000 parts?
1085
7250
400
6850