Page 1 of 1

Answer must be give in the engineering method format as shown in the second picture 3. A homeowner as eded to constructa

Posted: Sun May 15, 2022 9:50 pm
by answerhappygod
Answer Must Be Give In The Engineering Method Format As Shown In The Second Picture 3 A Homeowner As Eded To Constructa 1
Answer Must Be Give In The Engineering Method Format As Shown In The Second Picture 3 A Homeowner As Eded To Constructa 1 (25.41 KiB) Viewed 46 times
Answer must be give in the engineering method format as shown in the second picture 3. A homeowner as eded to constructant fexta fence around the property. The property has rectangular dimensions of '24. The owner has decided to wait and construct the feet wide and twenty one feet wide away and drewly gates respectively, thus reducing the overal ter of the force. The fence we be constructed using standard 4*4** *4*** support, 1x6x vacy Mans of treated lumber. The posts will serve as the vertical supports and they must be donar fotong the perimeter. There must be threexports connecting each vertical post. The one inch pracy by eight for high rattached orthogonal to the norton preces, and their actual with the wood processing is five and a far ches, Defore sales tax the price of the treated lumber purchase from Home Depotafows 8 post-$11.42*4**supports - 5.90 a 1x6x v anks = $1.9.In addition to the lumber, concret, hardware, qupment tools, and is stored to De $3.935.64 before taves it there is a 475% NC sales tax, determine many weeks 1 wook - 63 trust the homeowner work at the occupation to save up for the cost of the fence. The homeowners carns $7.25/hour (NC min wages and they can only save 10% of their paycheck for their fence What is your calculated live mont dosely to? .. 5 weeks . 109 weeks C 604 weeks d 3.05 weeks Bus Aw