If the power delay profile curve gives Pact) =-10 dB corresponding to a 30 osec excess delay. Given that rms delay sprea
Posted: Sun May 15, 2022 8:43 pm
If the power delay profile curve gives Pact) =-10 dB corresponding to a 30 osec excess delay. Given that rms delay spread I symbol time ratio should be less than 10% The smallest symbol period is: 0 a none of the above 0.6 3 ases c. 1 nsec 0 Od Onsec WW 0 e. 2 sec WA f. 5 nsec 0