For a system to work properly, all three of its independent subsystemattoncomoto the system, spare subsystems may be add
Posted: Sat May 14, 2022 8:04 pm
For a system to work properly, all three of its independent subsystemattoncomoto the system, spare subsystems may be added. It costs $225 to add a spare wstem 1.5256 $210 for a spare subsystem 3. However, a maximum of two spares may be added for each whom available for spare subsystems. For each subsystem, the probability that the tubystem with work of SPARES is given in the table below. Probability that a Subsystem Works subsystem 2 subsystem 3 Number of Spares subsystem 1 .70 .60 .85 .92 .85 .90 1 .98 97 .95 Inhility that the overall system will work properly, which
o 185 60 70 1 .90 .85 92 2 .95 .97 .98 If dynamic programming is to be used to maximize the probability that the overall system will work property, which following would be the states for the dynamic programming formulation? O none of the other choices o the probabilty of each type of subsystem working O the number of spares to add for each type of subsystem O the remaining amount of money available for spare subsystems
o 185 60 70 1 .90 .85 92 2 .95 .97 .98 If dynamic programming is to be used to maximize the probability that the overall system will work property, which following would be the states for the dynamic programming formulation? O none of the other choices o the probabilty of each type of subsystem working O the number of spares to add for each type of subsystem O the remaining amount of money available for spare subsystems