Suppose that the demand D for a spare airplane part has an exponential distribution with mean 70, that is, Š>0 0D() othe

Posted: Mon Nov 15, 2021 10:00 am
by answerhappygod
Suppose That The Demand D For A Spare Airplane Part Has An Exponential Distribution With Mean 70 That Is S 0 0d Othe 1
Suppose That The Demand D For A Spare Airplane Part Has An Exponential Distribution With Mean 70 That Is S 0 0d Othe 1 (306.14 KiB) Viewed 97 times
Solve hand explain by hand. Provide a python script to do the
same calculations.
Suppose that the demand D for a spare airplane part has an exponential distribution with mean 70, that is, Š>0 0D() otherwise e-$/70 70 This airplane will be obsolete in 1 year, so all production of the spare part is to take place at present. The production costs now are $1,200 per itemthat is, c= 1, 200but they become $11,000 per item if they must be supplied at later datesthat is, p = 11,000. The holding costs, charged on the excess after the end of the period, are $400 per item. (1) Determine the optimal number of spare parts to produce. (2) Suppose that the manufacturer has 25 parts already in inventory and production induces a fixed cost of K. Determine the optimal inventory policy. (3) Suppose that p cannot be determined now, but the manufacturer wishes to order a quantity so that the probability of a shortage equals 0.1. How many units should be ordered? (4) If the manufacturer were following an optimal policy that resulted in ordering the quantity found in part (3), what is the implied value of p?