Page 1 of 1

Problem Description: Using the floor plan, building dimensions, and construction materials as specified below, determine

Posted: Mon May 09, 2022 10:16 am
by answerhappygod
Problem Description Using The Floor Plan Building Dimensions And Construction Materials As Specified Below Determine 1
Problem Description Using The Floor Plan Building Dimensions And Construction Materials As Specified Below Determine 1 (28.28 KiB) Viewed 21 times
Problem Description: Using the floor plan, building dimensions, and construction materials as specified below, determine: a) Peak load time of the day and the month b) Total cooling load of the building based on peak load time and month determined in part (a).
Single Door Double Door Factory Building 100 ft Factory Building Location: Cleveland, Ohio Single Door Ceiling Height: 15 ft Windows: 10 ft W x 8ft H Doors: 10 ft Hx8 ft W 120 ft
. . Location: Cleveland, Ohio Building has a 2500 CFM mechanical ventilation. Work hours: 7:00 am - 12:00 am (two shifts) Number of employees per shift: 35 Lighting: 4 W/ft2 Inside temperature: 75 °F Inside the shop area there are 10 machines with 20 HP and 15 machines with 30 HP. All equipment consists of a motor out, driven equipment in. Concrete slab is insulated and no edge loss/gain Walls: Heavyweight - 8 in. concrete, 2 in. insulation (Group B wall, Table 6.3) Windows: Double clear glass, %4 in. thickness, light color Venetian blinds, aluminum frame, 10 ft W x 8 ft H Doors: 1 % in. thick steel with mineral fiber core, 10 ft W x 8 ft H Roof: Flat roof 2 in. heavyweight concrete with 2 in. insulation (Roof #4, Table 6.1) .