Page 1 of 1

2. (5 pts) A CAES facility is being designed; the cavern volume is 5000 m and the target power generation is 100 kWh. If

Posted: Mon May 09, 2022 9:37 am
by answerhappygod
2 5 Pts A Caes Facility Is Being Designed The Cavern Volume Is 5000 M And The Target Power Generation Is 100 Kwh If 1
2 5 Pts A Caes Facility Is Being Designed The Cavern Volume Is 5000 M And The Target Power Generation Is 100 Kwh If 1 (16.92 KiB) Viewed 25 times
2. (5 pts) A CAES facility is being designed; the cavern volume is 5000 m and the target power generation is 100 kWh. If P = Patm, what pressure (Pa) does the design team need to target to meet the power requirement? (be careful with your units!!) 2.1. (2 pts) If the power requirements are doubled, what is the new target final pressure?