Q11. While designing and constructing a new road the following area of cut required per station is listed below, find th
Posted: Sun May 08, 2022 9:20 pm
Q11. While designing and constructing a new road the following area of cut required per station is listed below, find the approximate total volume (yd) of soil to be removed for this project (12 points) Station Area (ft) Volume (cu ft) Volume (cu yd) 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 0 152 183 189 160 192 254 165 189 236 251 221