1. For each of the following network diagrams, determine both the critical path and the expected proj- ect duration. The
Posted: Sun May 08, 2022 4:33 pm
1. For each of the following network diagrams, determine both the critical path and the expected proj- ect duration. The numbers on the arrows represent expected activity times. a. AOA diagram 5 7 4 2 2 10 4 8 3 2 1 7 Ол 10 5 8 12 6 3 11 6 5 4 6 9
b. AON diagram 3 3 18 4 4 N 10 6 5 5 1 13 3 2. 9 8 9 11 7
d. AON diagram 7 8 00 A D 3 Start B E (End) 5 7 C F G G
b. AON diagram 3 3 18 4 4 N 10 6 5 5 1 13 3 2. 9 8 9 11 7
d. AON diagram 7 8 00 A D 3 Start B E (End) 5 7 C F G G