Page 1 of 1

E (4) A (4) G(4) C (3) 1 (3) B (3) F (4) H (2) D (3)

Posted: Sun May 08, 2022 4:31 pm
by answerhappygod
E 4 A 4 G 4 C 3 1 3 B 3 F 4 H 2 D 3 1
E 4 A 4 G 4 C 3 1 3 B 3 F 4 H 2 D 3 1 (48.6 KiB) Viewed 30 times
What is the project completion time?
What is the slack for task E?
E (4) A (4) G(4) C (3) 1 (3) B (3) F (4) H (2) D (3)