Page 1 of 1

We wish to find a single-sampling plan for a situation where 55000-units lots are shipped from a supplier. The supplier'

Posted: Sun Oct 03, 2021 11:16 am
by answerhappygod
We Wish To Find A Single Sampling Plan For A Situation Where 55000 Units Lots Are Shipped From A Supplier The Supplier 1
We Wish To Find A Single Sampling Plan For A Situation Where 55000 Units Lots Are Shipped From A Supplier The Supplier 1 (21.27 KiB) Viewed 102 times
We wish to find a single-sampling plan for a situation where 55000-units lots are shipped from a supplier. The supplier's process operates at a fallout level of 0.50% defective. We want the AOQL from the inspection activity to be 3% • Find the appropriate Dodge-Romig plan. n= c= • How much inspection will be necessary, on the average, if the supplier's process operates close to the average fallout level? Note: Enter numbers only. The rejectable quality level protection for this plan is %