Page 1 of 1

Pauline Found Manufacturing, Inc., is moving to kanbans to support its telephone switching-board assembly lines. Determi

Posted: Thu May 05, 2022 9:51 am
by answerhappygod
Pauline Found Manufacturing Inc Is Moving To Kanbans To Support Its Telephone Switching Board Assembly Lines Determi 1
Pauline Found Manufacturing Inc Is Moving To Kanbans To Support Its Telephone Switching Board Assembly Lines Determi 1 (105.46 KiB) Viewed 46 times
Pauline Found Manufacturing, Inc., is moving to kanbans to support its telephone switching-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost $30 Annual holding cost $110 per subassembly Daily production 30 subassemblies Annual usage 4,500 (50 weeks x5 days each x daily usage of 18 subassemblies) Lead time 16 days Safety stock 3 days' production Kanban container size = 78 units (round your response to the nearest whole number). Number of kanbans needed = kanbans (round your response to the nearest whole number).