Question 3 The table below contains observations of the time needed to overhaul a large diesel engine used in mining iro
Posted: Wed May 04, 2022 12:08 pm
please answer 1.2 and 3.2
Do not copy and paste.
please attempt the question only when you understand the module as there are different solutions for the same question. some are wrong
Question 3 The table below contains observations of the time needed to overhaul a large diesel engine used in mining iron ore. Assume that the shop manual specifies 85 to 115 hours for the job. Draw conclusions about the ability of the process to meet the specifications. 3.1 Determine whether the process is in control or not (12) (6) 3.2 Determine the new control limits for future process control 3.3 Perform Process Capability Analysis (12) [30] Individual Sample Statistics Sample X R Sample X 1 97.442 11.02 11 100.688 2 102.558 9.75 12 101.852 3 104.224 16.02 13 101.490 4 102.400 14.06 14 93.780 5 103.334 19.29 15 96.290 6 97.824 12.16 16 101.368 7 103.340 10.01 17 102.514 R 9.55 9.88 19.94 10.68 6.32 10.73 9.46 2
Do not copy and paste.
please attempt the question only when you understand the module as there are different solutions for the same question. some are wrong
Question 3 The table below contains observations of the time needed to overhaul a large diesel engine used in mining iron ore. Assume that the shop manual specifies 85 to 115 hours for the job. Draw conclusions about the ability of the process to meet the specifications. 3.1 Determine whether the process is in control or not (12) (6) 3.2 Determine the new control limits for future process control 3.3 Perform Process Capability Analysis (12) [30] Individual Sample Statistics Sample X R Sample X 1 97.442 11.02 11 100.688 2 102.558 9.75 12 101.852 3 104.224 16.02 13 101.490 4 102.400 14.06 14 93.780 5 103.334 19.29 15 96.290 6 97.824 12.16 16 101.368 7 103.340 10.01 17 102.514 R 9.55 9.88 19.94 10.68 6.32 10.73 9.46 2