Approximate service time calculations (assume 6 min. per vehicle, 15 stations) Assume 25 feet per vehicle. Concept inclu
Posted: Wed May 04, 2022 10:51 am
Approximate service time calculations (assume 6 min. per
vehicle, 15 stations)
Assume 25 feet per vehicle. Concept includes ±4,000 feet of
total queuing (2 lanes @ ±2,000 feet each) from entry point at
street to testing station.
• This allows for ___e___ vehicles that can queue (___f__ feet/
__g__ feet per vehicle)
• Once filled, the last vehicle in the queue would have an
approximate __h___ minute wait time
Explain how you came up with this number
vehicle, 15 stations)
Assume 25 feet per vehicle. Concept includes ±4,000 feet of
total queuing (2 lanes @ ±2,000 feet each) from entry point at
street to testing station.
• This allows for ___e___ vehicles that can queue (___f__ feet/
__g__ feet per vehicle)
• Once filled, the last vehicle in the queue would have an
approximate __h___ minute wait time
Explain how you came up with this number