A 4 m thick clay layer is double drained and the coefficent of consolidation is 0.038 m²/sec. (a) calculate the time tak
Posted: Wed May 04, 2022 9:34 am
A 4 m thick clay layer is double drained and the coefficent of consolidation is 0.038 m²/sec. (a) calculate the time taken to reach 55% consolidation (b) If the ultimate consolidation settlement is 20 mm what would be the settlement at 55% consolidation?