Page 1 of 1

c) A construction project involves with six activities as outlined in logical table below. The duration and resource (en

Posted: Wed May 04, 2022 9:30 am
by answerhappygod
C A Construction Project Involves With Six Activities As Outlined In Logical Table Below The Duration And Resource En 1
C A Construction Project Involves With Six Activities As Outlined In Logical Table Below The Duration And Resource En 1 (39.39 KiB) Viewed 39 times
C A Construction Project Involves With Six Activities As Outlined In Logical Table Below The Duration And Resource En 2
C A Construction Project Involves With Six Activities As Outlined In Logical Table Below The Duration And Resource En 2 (39.39 KiB) Viewed 39 times
c) A construction project involves with six activities as outlined in logical table below. The duration and resource (engineers and Crew members) needed for each activity is also provided in table. We assume activity duration equals to resource duration. ACTIVITY Succeeding Activity Duration of Proceeding Crew (resources) Activity START A 100 A100 A200 and A300 4 days 4 A200 A400 A300 A500 A400 A600 2Days 4 days 3 days 2 days 2 days A500 A600 A600 FINISH 1) Develop a network Diagram clearly presenting Early Start, early Finish, Late Start and Late Finish and Total FLOAT. Identify Critical Path. 2) Prepare Resource Chart 23452