Classify each of the following cost items as either a direct or an indirect cost. Two gallons of paint used for painting
Posted: Mon May 02, 2022 11:25 am
Classify each of the following cost items as either a direct or an indirect cost. Two gallons of paint used for painting one of the rooms i [Choose] the project Direct cost Indirect cost Furnish and delivery of 2x6 lumber used for floor joists Choose Monthly electricity bill for the jobsite office trailer [Choose Choose Wage of a carpenter employed to setup formwork for a concrete wall < Rent of a backhoe use to excavate for the foundation of a fire station Choose Progress payment made to the electrical contractor Choose Rent for the field office trailer Choose Wage of labor used to clean up the job site Choose Premium paid to surety company for the project bonds Choose Salary of the project manager Choose
Question 48 At which project phase is the actual construction cost determined? Idea/Need phase During the project bidding During the construction phase At the end of the project or later
Which of the following cost estimating methods is the fastest and least accurate? Conceptual / square-foot estimates Parametric estimates Assembly estimates Detailed estimates
Question 48 At which project phase is the actual construction cost determined? Idea/Need phase During the project bidding During the construction phase At the end of the project or later
Which of the following cost estimating methods is the fastest and least accurate? Conceptual / square-foot estimates Parametric estimates Assembly estimates Detailed estimates