2. A pipe crew is installing new storm drainage pipe, using a new pipe laser which allows them to confirm the slope of t

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

2. A pipe crew is installing new storm drainage pipe, using a new pipe laser which allows them to confirm the slope of t

Post by answerhappygod »

2 A Pipe Crew Is Installing New Storm Drainage Pipe Using A New Pipe Laser Which Allows Them To Confirm The Slope Of T 1
2 A Pipe Crew Is Installing New Storm Drainage Pipe Using A New Pipe Laser Which Allows Them To Confirm The Slope Of T 1 (20.11 KiB) Viewed 32 times
2. A pipe crew is installing new storm drainage pipe, using a new pipe laser which allows them to confirm the slope of the new pipe as it is installed. The upstream end of the pipe is located at STA 108+65.35 with an invert elevation of 115.25' and the downstream end of the pipe is located at STA 105+25.50 with an invert elevation of 109.64'. What slope (expressed as a percentage) should be programmed into the laser, if the crew is installing the pipe up-gradient?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply